|
Heat:
Gas heat with perimeter infrared gas heating
Sprinkler: 100% Wet (existing,
but inoperative dry sprinkling system)
Lighting:
Fluorescent (85%), metal Halide (15%)
Utilities: Electrical
500 KV, 277/480 Volts; 4-Wire, 3-Phase. Supplied by Lubbock
Power & Light
Rail
Service: Burlington Northern Spur (can be reactivated)
Adjacent to building, Ten 8 X 10 loading doors
Zoning: Industrial
Last Use: Warehouse
Taxes: $44,061.68 (2001)
|
|